Skip to content
Free tool

Pier and Jack Planner

Enter the beam run and the sag and see how many supports and how many lifting visits to expect.

Sagging Floor Repair and Support Jacks by Crawl Space Boys
Support spacing to plan for
Call 800-207-0499

    A planning guide with typical spacing and a slow lifting rule of thumb. Beam size, loads and soil decide the real plan, and a large sag may need an engineer.

    How to use it

    Three quick steps

    1. 1Enter the beamRun length and how many supports already stand well.
    2. 2Enter the sagThe dip at the worst spot, in inches.
    3. 3Read the planSee supports, spacing and lift visits.
    Questions

    About the pier and jack planner

    Is this an engineering plan?

    No. It is a planning guide with typical spacing and a slow-lift rule of thumb. Beam size, loads and soil decide the real plan.

    Why lift slowly?

    Raising a floor too fast can crack finishes above and stress the frame, so lifting happens in small steps.

    When do I need an engineer?

    For large sags, wide spacing or unusual loads. The planner flags it.

    Find out what is under your house.

    Call or text, or send the form for your free estimate. Tell us what you notice, from smells and cold floors to water and sagging.

    Free estimate

    Dry floors. Healthy air. Solid ground.

    Tell us what you notice under the house. We read every message and reply with clear next steps and a time for your free estimate.

    • What you notice: smells, cold floors, water, sagging, pests or mold
    • The city, a rough size and any result you saved from a tool on this site
    • A clear estimate: the work, the order, the materials and the timeline, before any work begins
    Prefer to talk? Call or text800-207-0499

    Your estimate request

    Prefer to type? Text your request. We only use your details to respond to your request.